ACCOMMODATION BLOCKS FOR ALWARDI [ Bahrain ]

Design, production, delivery and erection of 2 nos full building system Accommodation Blocks:
1. Hollowcore slabs 150mm thick = 3,903m2
2. 230mm thk Insulated external loadbearing panels
3. 180mm thk internal loadbearing panels
4. 120mm thk internal non-loadbearing panels
5. Columns
6. Staircases
External insulated load bearing panels were given an exposed RAK aggregates finished by sandblasting on pink coloured concrete.
Concrete volume = 1,130m3
Reinforcement = 36T

 

STORE - Bahrain [ Bahrain ]

Design, production, delivery and erection of columns (155 nos 3-storey high), beams (639 nos) and hollowcore slabs of size 265mm, 320mm and 400mm thick (approximately 48,370m2)

 

AWALI MOSQUE [ Bahrain ]

Design, production, delivery and erection of :
1. Hollowcore slabs 500mm thick = 915m2
- 320mm thick = 1,722m2
- 265mm thick = 909m2
- 200mm thick = 869m2
- 150mm thick = 619m2
2. Normal and pre-stressed beams of various sizes = 28 nos
18,000mm x 1450mm x 300mm
18,000mm x 1400mm x 500mm
13,800mm x 1450mm x 300mm
6,500mm x 1450mm x 300mm
3. Domes - 18,000mm diameter = 1 no.
- 8,600mm diameter = 4 nos
finishing for the domes were exposed Omani aggregates by polishing externally on white concrete
Concrete volume = 381m3
Reinforcement = 131T

 

LABOUR ACCOMMODATION BLOCKS [ Bahrain ]

Design, production, delivery and erection of 2 nos full building system Labour Accommodation Blocks:
1. Hollowcore slabs 200mm thick = 6,494m2
2. 230mm thk Insulated external loadbearing panels
3. 180mm thk internal loadbearing panels
4. 120mm thk internal non-loadbearing panels
5. Columns
6. Beams
7. Staircases
External insulated loadbearing panels were given an exposed 5mm Omani aggregates finished by sandblasting on beige coloured concrete.
Concrete volume = 1,350m3
Reinforcement = 88T

 

Bright Start Tower & Car Park [ Dubai ]


It is a G+M+59 storey building with a total height of 280 meters. UPC scope is to erect HCS and cladding panels upto 217 meters. Scope of operation is design, manufacture, supply and erects precast beams, staircases, balconies, hollowcore slabs, solid slabs and cladding panels.

It is time bound project and one floor is to be finished in every 6 days. With good planning, co-ordination between site and other departments of UPC and client, UPC his managing to finish one floor in 3-4 days. Each floor is divided in 2 zones each zone takes about 16 hours of erection.

 

 